Build your BOMs.
Keep every specification connected.
Define components, assemble bills of materials, and keep specifications, drawings, revisions, and approvals linked in Greenlinq.
Request a demoComponent assembly
ASM-2040 · AssembliesLine items
4 items · Revision 04| Component / specification | Material | Qty | Unit | Rev | Status |
|---|---|---|---|---|---|
PistonCMP-101 | Aluminum alloy | 4 | ea | 04 | Approved |
Connecting rodCMP-102 | Forged steel | 4 | ea | 02 | Approved |
CrankshaftCMP-103 | Forged steel | 1 | ea | 03 | In review |
Main bearingsCMP-104 | Multi-layer alloy | 1 | set | 02 | Approved |
Spec Score
Field completeness23 of 25 required or essential fields completed.
This example scores required and essential field completeness. Configured Data Quality checks can also contribute to Spec Score.Details to review
This sample BOM has 4 linked component specifications. Each line retains its own quantity and specification revision.
- Components and quantities
Piston: 4 ea; Connecting rod: 4 ea; Crankshaft: 1 ea; Main bearings: 1 set.
- Specification review
CMP-103 · Crankshaft, revision 03, is in review. The other linked specifications are approved.
ASM-2040 · BOM revision 04
- CMP-101 · Piston
- 4 ea · Aluminum alloy · Rev 04 · Approved
- CMP-102 · Connecting rod
- 4 ea · Forged steel · Rev 02 · Approved
- CMP-103 · Crankshaft
- 1 ea · Forged steel · Rev 03 · In review
- CMP-104 · Main bearings
- 1 set · Multi-layer alloy · Rev 02 · Approved
From individual specifications
to a complete BOM.
Define once. Link where needed.
Create and maintain specifications for your materials, components, and assemblies. Use them to build BOMs, with documents, revisions, and approvals linked in one place.
Review documents and revision history.
Bring specifications, drawings, and supporting documents together with your BOMs. Maintain revision history and track approvals in one place.
A few components. A complete picture.
Explore a sample BOM. Select a component, change a quantity, or add a line to see how the details come together.
Component assembly
ASM-2040 · AssembliesComponent lines
| Component / Specification | Quantity | Unit | Revision | Status | Actions |
|---|---|---|---|---|---|
| ea | 04 | Approved | |||
| ea | 02 | Approved | |||
| ea | 03 | In review | |||
| set | 02 | Approved |
Spec Score
Field completeness23 of 25 required or essential fields completed.
This example scores required and essential field completeness. Configured Data Quality checks can also contribute to Spec Score.Details to review
This sample BOM has 4 linked component specifications. Each line retains its own quantity and specification revision.
- Components and quantities
Piston: 4 ea; Connecting rod: 4 ea; Crankshaft: 1 ea; Main bearings: 1 set.
- Specification review
CMP-103 · Crankshaft, revision 03, is in review. The other linked specifications are approved.
ASM-2040 · BOM revision 04
- CMP-101 · Piston
- 4 ea · Aluminum alloy · Rev 04 · Approved
- CMP-102 · Connecting rod
- 4 ea · Forged steel · Rev 02 · Approved
- CMP-103 · Crankshaft
- 1 ea · Forged steel · Rev 03 · In review
- CMP-104 · Main bearings
- 1 set · Multi-layer alloy · Rev 02 · Approved
More than a list of parts.
Check specification health, explore where components are used, and compare linked pricing before your next decision.
Specification health
Products · Connected specificationsUse Spec Score to review required and essential field completeness. Explore related context with Insights and LINQ Assist.
Material and revision recorded
Supplier document missing
Revision review overdue
Illustrative records and prices. Select a tab to explore.
Spec Score
Field completeness18 of 20 required or essential fields completed.
This example scores required and essential field completeness. Configured Data Quality checks can also contribute to Spec Score.Details to review
The sample health view flags a missing supplier document for CMP-102 and an overdue revision review for CMP-103. CMP-101 has its material and revision recorded.
Specification health · Sample findings
- CMP-101 · Piston
- Material and revision recorded
- CMP-102 · Connecting rod
- Supplier document missing
- CMP-103 · Crankshaft
- Revision review overdue
Questions,
connected.
Can I use a component in more than one BOM?
The example shows reusable component specifications linked to an assembly. Greenlinq’s connected record model lets you keep component details and their related BOMs in context.
What happens when a specification changes?
Revision history gives teams a record of changes. Review the relevant component and BOM revisions before approving a specification change.
Can we configure our own specification fields?
Greenlinq supports configurable records and attributes. The fields shown here are examples; the demo can focus on your materials, components, and terminology.
Bring a spec sheet.
See how it could work.
Review your source data and required outputs. Explore module-based pricing and a migration plan for your team.
Request a demoWhat to prepare


