Follow the pieces
Record when each item starts and finishes a step, see elapsed time, and keep its history connected to the job and drawing.
Track each item through its fabrication steps, with start times, finish times, and elapsed duration. Keep customer requirements, materials, and drawings connected to the work. See what is running, what has finished, and what comes next.
Connect the information that product teams, fabricators, quality reviewers, and customer-facing teams need to understand the same job.
Record when each item starts and finishes a step, see elapsed time, and keep its history connected to the job and drawing.
Review the stock and specification context behind the work, including material dimensions and relevant remnants.
Bring planned work and review requirements into the conversation before confirming a handoff.
Follow Saw, CNC, Polish, QC, Load, and Install for each item. Try Start and Finish, inspect its timing history, and switch items to compare progress. Return to the job for materials and planned work.
Start a step when work begins. Finish it to save its end time and duration.
Elapsed time includes time between Start and Finish, including any idle time. All times use the sample clock in Eastern time.
Try starting the next step, advance the sample clock, then finish it. Each item keeps its own history.
3 of 6 steps have a finish timestamp. QC has not started.
A Finish action records timing and progress. Keep the applicable inspection evidence, job release, and customer acceptance in their own review workflow.
FAB-312 · Return section is at Inspection bay, with a recorded stage of quality review. Edge-profile check outstanding. Start QC when the responsible team is ready. The job remains in progress; a finished step does not release the complete job.
The 1200 × 650 × 20 mm piece references drawing revision 03 and source slab SLB-482.
Saw: Finished · CNC: Finished · Polish: Finished · QC: Not started · Load: Not started · Install: Not started. Recorded location and stage reflect this sample record, rather than a live machine signal.
2 pieces have not finished QC. The installation window is requested for 5 Nov but remains unconfirmed.
3 of 6 steps finished. Waiting · Next: QC. Started and finished timestamps are recorded per item; elapsed time is time between those timestamps.
Configure the records, fields, and relationships around your manufacturing or fabrication process.
Search by job, piece, customer, or configured details so teams can locate the information behind a status question.
Link drawings, procedures, production notes, and quality documents to the records they describe.
Review outstanding work and supporting evidence with the responsible people before marking the next milestone complete.
Specifications and BOMs describe the product and materials. Work Instructions explain the procedure. Quality records capture findings and follow-up. Connect that context to the job so a progress update can lead to the right next review.
The example uses a stone counter to make individual pieces, material dimensions, and handoffs concrete. Review your own products, components, materials, and fabrication process during the demo to define the appropriate configuration.
The industry page introduces relevant product-information use cases. This feature page explores how a job can connect fabricated pieces, materials, planned work, and supporting evidence.
Bring the material records, units, dimensions, locations, and allocation rules your team uses. We will review the required inventory configuration and any system connections. The website example shows separate slab and remnant records without moving or reserving stock.
No. The outline illustrates the selected piece. The area calculation uses rectangular dimensions only. Cutting optimization, machine connections, live signals, and production-system integrations require separate scope confirmation.
Yes. Each item can carry its configured step sequence, with a separate start time, finish time, and elapsed duration for every step. The example uses Saw, CNC, Polish, QC, Load, and Install. Elapsed time measures the interval between recorded timestamps, including any idle time.
Planned dates help teams coordinate upcoming work. Recorded progress and required evidence help determine readiness. A planned date alone does not confirm completion, quality acceptance, or installation release.
Bring one representative job, its piece or component list, drawings, material records, schedule, and the checks needed before each handoff. We will work through the relationships and implementation scope with you.
Review your pieces, material requirements, drawings, and next review steps in a Greenlinq demo.